TickITplus Scheme Clarifications
- Existing TickIT certified organisation can achieve TickITplus Foundation certification by doing a transition assessment, rather than a full certification assessment
- Any clients achieving TickITplus Foundation certification through the transition route will have their TickITplus certificate validity set to the date of expiry of their previous TickIT certificate
- Resources for those working towards TickITplus certification include: The Core Scheme Requirements (CSR), The Base Process Library (BPL) and The Kick Start Guide
- The deadline for organisations to transition to TickITplus is 30 November 2014.
Known changes to TickITplus publications:
Change note for Base Process Library 1.1.3 |
||
Reference |
Errata |
Acknowledgement |
Table 1, change 1 |
Process should be PRJ.3, not ORG.1 |
JC, PB |
Table 1, change 2 |
Scope Profile should be Legal & Compliance, not Corporate Strategy Planning and Management |
JC |
Table 2, change 44 |
“Lifecycle Management Procedure changed to lifecycle Management Procedure” changed to Lifecycle Management Procedures changed to Lifecycle Management Procedure. |
JC |
Table 2, change 61 |
“decided on” changed to “are agreed” at the end of the last paragraph. |
JC |
Table 2, change 65 |
Removed reverences under ISO 2000-1 column. |
JC |
Table 2, change 83 |
“…requirement are achieved, and to enable improvements” changed to “…requirements are met, and improvements are being made.” |
JC |
Table 2, change 158 |
“IWP” missing under the ‘column’ column |
JC |
Core Scheme Requirements |
V1.1.2 |
|
Reference |
Errata |
Acknowledgement |
No changes |
Acknowledgement |
||
Who |
Name |
Organisation |
JC |
Jonathan Clarke |
Anite Ltd |
PB |
Paul Breslin |
DNV GL |