TickITplus Scheme Clarifications

  • Existing TickIT certified organisation can achieve TickITplus Foundation certification by doing a transition assessment, rather than a full certification assessment
  • Any clients achieving TickITplus Foundation certification through the transition route will have their TickITplus certificate validity set to the date of expiry of their previous TickIT certificate
  • Resources for those working towards TickITplus certification include: The Core Scheme Requirements (CSR), The Base Process Library (BPL) and The Kick Start Guide
  • The deadline for organisations to transition to TickITplus is 30 November 2014.

Known changes to TickITplus publications:

Change note for Base Process Library 1.1.3

Reference

Errata

Acknowledgement

Table 1, change 1

Process should be PRJ.3, not ORG.1

JC, PB

Table 1, change 2

Scope Profile should be Legal & Compliance, not Corporate Strategy Planning and Management

JC

Table 2, change 44

“Lifecycle Management Procedure changed to lifecycle Management Procedure” changed to Lifecycle Management Procedures changed to Lifecycle Management Procedure.

JC

Table 2, change 61

“decided on” changed to “are agreed” at the end of the last paragraph.

JC

Table 2, change 65

Removed reverences under ISO 2000-1 column.

JC

Table 2, change 83

“…requirement are achieved, and to enable improvements” changed to “…requirements are met, and improvements are being made.”

JC

Table 2, change 158

“IWP” missing under the ‘column’ column

JC

Core Scheme Requirements

V1.1.2

Reference

Errata

Acknowledgement

  No changes  

 

Acknowledgement

Who

Name

Organisation

JC

Jonathan Clarke

Anite Ltd

PB

Paul Breslin

DNV GL